Our customer is involved with the construction of a new gold mine in Ecuador, one of the largest gold mining projects currently in construction. The mine was designed and implemented by a Quebec engineering firm, with whom we collaborated to make this project a success.
PCI performed the following tasks
• Design the standard templates used to control the plant equipment from the SCADA application, ensuring that they correspond to the PLC control blocks.
• Update the graphical displays so that they correspond to the latest version of the process drawings, so that they are ready to use when required to test the equipment.