fbpx
< back

Migration of a system in a chemical plant

Realized by :
UNiRO

Migration of an obsolete control system to a new system. 1700 inputs / outputs. We teamed up with the customer to find the best approach to meet the needs of production, maintenance and engineering.

Realization specifications

Realization details
Nombre de projets similaires réalisés
9
Produit ciblé

ABB 800xA. Migrate the system gradually from one planned plant stop to another without affecting production and maintenance
Application
Applications utilisées
Factory automation Ingénierie de procédés Planification de projet