The customer wished to increase the production capacity for one of its products. To satisfy the customer's need, PCI performed the following tasks:
– Design of the control system, the electrical distribution and the Ethernet network
– Design of the control panels for the process control and the conveyor lines
– Factory acceptance tests (FAT) at the original equipment manufacturer (OEM) sites
– Integration of the machines into a coherent bottling line
– Programming of the filling process
– Validation of the machine safety circuits
– 24/7 Support